Friday, October 21, 2011

Lighting, fans, more color......

The Dining Room

The Foyer

The Study

The Great Room
View of the fireplace and built-ins

Master Bedroom

Master Bath

Master Closet

Master Shower

Abby's Room

Abby's Bath

Great Room
View into Breakfast and Kitchen

Guest Bedroom 1


Guest Bedroom 2

Jack & Jill Guest Bath

Pet Room

Mud Room

Game Room/Bar

Wine Room

Pool/Game Room Bath

Pool/Game Room Toilet and Shower

Outdoor Kitchen
Starting to get some stain

Back Porch
Fans are in and covered getting ready for stain

Garage Lighting

Front Entrance - Side View

Front Entrance - Frontal View

Driveway

Monday, October 17, 2011

More colors and flooring...

Things are continuing to move along. More walls are painted. The granite is in. Plumbing and Electric trim outs are this week and next. The driveway is coming along and along and along.....


The driveway is being formed and poured in stages.
 It will be all concrete from house to the road.

This is the front sidewalk going out to the next stage of the driveway to be poured.

Abby was here!  Left her imprints in the fresh concrete driveway.

The front doors have been delivered and installed. 
They will be stained this week.

Yes, that is called exuberant pink!
 Luckily it is only one accent wall.

This is the study in cilantro green.
When the sun is not shining on it, it is a deeper color.

And of course the Aggie Room!
Nice maroon color.

This is the cool marble in the pool bath with tile backsplash.
It will have a sink that  is clear and sits on top.

This the maroon in the pool bath.
\ Really looks good with the marble and tile.

This is the built-ins in the Great Room. 
The stain looks awesome. 
The mantle was put into place and awaits stain.
 The 55" TV is in and will be installed above the mantle.

The Master  Closet is still in progress but this is a glimpse of Melissa's side with the tile.

The tub decking is ready for tub installation this week.

Abby's tile around her tub/shower combo

The pool shower.

The floor tile in the pool bath

This is the foyer. 
The tile lattice-work has been installed awaiting stain and sealing.

This is a small example of the kitchen tile. 
The rest is covered up to keep the painters from getting stuff all over it.

The kitchen in progress.
The cabinets look great.
 The granite is in. 
Sinks and lectrical this week.

The flooring in the pet room.

The bar granite is in but dusty.
The bar cabinet is awaiting stain.

The built-in wine rack is awaiting stain

The guest room shower.