| The driveway is being formed and poured in stages. It will be all concrete from house to the road. |
| This is the front sidewalk going out to the next stage of the driveway to be poured. |
| Abby was here! Left her imprints in the fresh concrete driveway. |
| The front doors have been delivered and installed. They will be stained this week. |
| Yes, that is called exuberant pink! Luckily it is only one accent wall. |
| This is the study in cilantro green. When the sun is not shining on it, it is a deeper color. |
| And of course the Aggie Room! Nice maroon color. |
| This is the cool marble in the pool bath with tile backsplash. It will have a sink that is clear and sits on top. |
| This the maroon in the pool bath. \ Really looks good with the marble and tile. |
| This is the built-ins in the Great Room. The stain looks awesome. The mantle was put into place and awaits stain. The 55" TV is in and will be installed above the mantle. |
| The Master Closet is still in progress but this is a glimpse of Melissa's side with the tile. |
| The tub decking is ready for tub installation this week. |
| Abby's tile around her tub/shower combo |
| The pool shower. |
| The floor tile in the pool bath |
| This is the foyer. The tile lattice-work has been installed awaiting stain and sealing. |
| This is a small example of the kitchen tile. The rest is covered up to keep the painters from getting stuff all over it. |
| The kitchen in progress. The cabinets look great. The granite is in. Sinks and lectrical this week. |
| The flooring in the pet room. |
| The bar granite is in but dusty. The bar cabinet is awaiting stain. |
| The built-in wine rack is awaiting stain |
| The guest room shower. |