We are getting excited.  Things are about to start taking shape.  The first load of lumber was delivered today. Several more loads to follow this afternoon and tomorrow.


The forms are complete.  The post-tension cables are run.  The floor plugs have been set in place.  Concrete starts pouring at 0600 in the morning.  Will try and get out and post some pics of the concrete boom truck.  The stamped concrete people will be here around 0800 tomorrow to start the back porch staining and stamping. 

James says that framing starts Friday and that there should be a roof on the house within two weeks!